by NAES Admin | Jul 16, 2024 | Case Study
NAES Power Contractors has provided ongoing maintenance, modification and construction at the 2,218 MW Colstrip facility since 1988, including services during normal operating periods, scheduled outages and unscheduled outages. NPC provided the same services at the...
by NAES Admin | Jul 16, 2024 | Case Study
AMP Fremont is a 540 MW nominal load 2 x 1 natural gas fired generating station with 163 MW of duct-firing capacity. American Municipal Power (AMP) and its members self-operate several electric plants. However, for its first combined-cycle gas turbine facility – the...
by NAES Admin | Jul 16, 2024 | Case Study
The largest simple cycle plant in the US, Elwood consists of 9 GE Frame 7FA combustion turbines. The facility is a full merchant power as of Spring 2017 with 15 full-time employees covering 24/7. Elwood, Illinois: NAES Environmental Services was responsible for...
by NAES Admin | Jul 16, 2024 | Case Study
Connecticut’s Materials Innovation and Recycling Authority (MIRA) facility presents a triple challenge to an operator, in that its three discrete units – a Waste Processing Facility (WPF), a Power Block Facility (PBF) and an auxiliary Jet Turbine Facility (JTF) – each...
by NAES Admin | Jul 16, 2024 | News
By Leonard Wills, NERC CIP Reliability Specialist In today’s digital age, the internet remains an indispensable resource, providing users with numerous sources of information, goods, job opportunities, and other services. As of April 2024, 5.35 billion people use the...