by NAES Admin | Jul 16, 2024 | Case Study
49 MW dual-fuel natural gas and oil plant that consists of an electric generation plant and a distribution substation located in Chaska, Minnesota. The facility sits on seven acres approximately 500 feet from the Minnesota River. Dry Air Injection System Solves...
by NAES Admin | Jul 16, 2024 | News
By Laura Christensen, Senior NERC Reliability Specialist NERC, in accordance with its regulatory obligations under the Federal Power Act, has initiated a draft data request concerning the operation of generators during cold weather. The draft is in response to...
by NAES Admin | Jul 16, 2024 | Case Study
NAES Environmental serviced a 320 MW coal-fired cogeneration plant in the mid-west, which utilizes four coal-fired circulation fluidized bed (CFB) boilers and two steam turbines and their respective generators. The facility controls NOx and SO2 emissions...
by NAES Admin | Jul 16, 2024 | News
By Shaun Rohret, Senior NERC Reliability Specialist There is still a lot of activity at FERC and NERC based around Extreme Cold Weather Grid Operations, Preparedness and Coordination. On June 27, 2024, FERC released an order approving EOP-012-2 and...
by NAES Admin | May 13, 2024 | News
By Sean Thompson, NERC Supervisor The digital age has intensified the need for robust cybersecurity measures across all sectors, particularly within the Bulk Electric System (BES). The North American Electric Reliability Corporation (NERC) has responded to this...