Shady Point

Shady Point

NAES Environmental serviced a 320 MW coal-fired cogeneration plant in the mid-west, which utilizes four coal-fired circulation fluidized bed (CFB) boilers and two steam turbines and their respective generators. The facility controls NOx and SO2 emissions...
Embracing Security: Navigating CIP-003-9 Implementation

Embracing Security: Navigating CIP-003-9 Implementation

By Sean Thompson, NERC Supervisor The digital age has intensified the need for robust cybersecurity measures across all sectors, particularly within the Bulk Electric System (BES). The North American Electric Reliability Corporation (NERC) has responded to this...
2023 Long Term Risk Assessment (LTRA)

2023 Long Term Risk Assessment (LTRA)

By Allegra Jones, NERC Reliability Specialist In December, NERC released their 2023 Long Term Risk Assessment (LTRA). The LTRA is the ERO’s self-assessment of the Bulk Power System’s (BPS) ability to meet demand over the next 10 years. This latest assessment...