by NAES Admin | Jul 16, 2024 | Case Study
NAES Power Contractors (NPC) installed a new Dry Sorbent Injection (DSI) system and an Activated Carbon Injection (ACI) system at a major coal-fired generating station owned by a cooperative in the Midwest as part of a regional air-quality project. The project...
by NAES Admin | Jul 16, 2024 | Case Study
NAES Power Contractors (NPC) rebuilt an Alstom air preheater at an 850 MW coal-fired plant. NPC worked around the clock for three weeks to expedite the unit’s return to service. The team built temporary shelters to keep the major weather from impeding the work and...
by NAES Admin | Jul 16, 2024 | Case Study
NAES Power Contractors (NPC) had responsibility for site management, craft labor and directing subcontractors for this $31 million-plus project at the 1,800 MW Conemaugh Generating Station. NPC s upplied and installed new electrostatic precipitator (ESP) internals for...
by NAES Admin | Jul 16, 2024 | Case Study
NAES Power Contractors has provided ongoing maintenance, modification and construction at the 2,218 MW Colstrip facility since 1988, including services during normal operating periods, scheduled outages and unscheduled outages. NPC provided the same services at the...
by NAES Admin | Jul 16, 2024 | Case Study
AMP Fremont is a 540 MW nominal load 2 x 1 natural gas fired generating station with 163 MW of duct-firing capacity. American Municipal Power (AMP) and its members self-operate several electric plants. However, for its first combined-cycle gas turbine facility – the...
by NAES Admin | Jul 16, 2024 | Case Study
The largest simple cycle plant in the US, Elwood consists of 9 GE Frame 7FA combustion turbines. The facility is a full merchant power as of Spring 2017 with 15 full-time employees covering 24/7. Elwood, Illinois: NAES Environmental Services was responsible for...