by NAES Admin | Jul 16, 2024 | Case Study
Connecticut’s Materials Innovation and Recycling Authority (MIRA) facility presents a triple challenge to an operator, in that its three discrete units – a Waste Processing Facility (WPF), a Power Block Facility (PBF) and an auxiliary Jet Turbine Facility (JTF) – each...
by NAES Admin | Jul 16, 2024 | Case Study
49 MW dual-fuel natural gas and oil plant that consists of an electric generation plant and a distribution substation located in Chaska, Minnesota. The facility sits on seven acres approximately 500 feet from the Minnesota River. Dry Air Injection System Solves...
by NAES Admin | Jul 16, 2024 | Case Study
NAES Environmental serviced a 320 MW coal-fired cogeneration plant in the mid-west, which utilizes four coal-fired circulation fluidized bed (CFB) boilers and two steam turbines and their respective generators. The facility controls NOx and SO2 emissions...