NAES Construction & Independent Monitoring
Detailed Insights from Start to Finish
Conventional MWs
Renewable MWs
Facilities Managed
Construction Projects
Safety | Reliability | Compliance
Focus on the Fundamentals
With our extensive experience, we offer comprehensive solutions for power generation and industrial operations.
How We Save You
Cost Efficiency
By leveraging our extensive experience, we can offer cost-effective solutions for power generation and industrial operations. Our services optimize operational efficiency, leading to significant cost savings.
Specific to Your Needs
Customized Solutions
We are known for working closely with our clients to develop customized solutions that meet their specific needs. This tailored approach ensures that the services provided are as relevant and effective as possible.
Construction & Independent Monitoring
Service Description
Our Construction and Independent Monitoring service offers a dual approach to ensuring project success.
We provide comprehensive construction oversight, focusing on adherence to specifications, quality control, and project timelines.
Additionally, our independent monitoring ensures that all aspects of a project meet contractual and regulatory compliance, offering stakeholders peace of mind through every phase of construction.
This service is designed to offer a holistic solution for managing complex construction projects, ensuring they are completed efficiently, on time, and within budget.
Specific to Your Needs
Unlock Your Facility’s Full Potential
The difference between leading and lagging often hinges on the operational excellence and maintenance efficiency of your facilities.
This is where NAES transforms your challenges into opportunities. Our team of experts brings a wealth of industry experience and a proven track record of enhancing performance across a wide array of energy facilities.
Contact a service expert today.
Connect with Owen
Statement of Qualifications
The NAES Difference
Explore how we can elevate your operations by downloading our Statement of Qualifications (SOQ). This comprehensive guide provides an overview of our services, expertise, and the value we bring to facilities like yours. It’s a hassle-free way to learn more about our approach to operations and maintenance
Get Your Download
Success Stories
Case Studies
DCI & ACI Systems Installations
NAES Power Contractors (NPC) installed a new Dry Sorbent Injection (DSI) system and an Activated Carbon Injection (ACI) system at a major coal-fired generating station owned by a cooperative in the Midwest as part of a regional air-quality project. The project supported the U.S. Environmental Protection Agency’s (EPA’s) new Mercury
Air Preheater Rebuild
NAES Power Contractors (NPC) rebuilt an Alstom air preheater at an 850 MW coal-fired plant. NPC worked around the clock for three weeks to expedite the unit’s return to service. The team built temporary shelters to keep the major weather from impeding the work and coordinated with client representatives for
Conemaugh ESP Rebuild
NAES Power Contractors (NPC) had responsibility for site management, craft labor and directing subcontractors for this $31 million-plus project at the 1,800 MW Conemaugh Generating Station. NPC s upplied and installed new electrostatic precipitator (ESP) internals for Units 1 and 2 (four boxes total) during two power outages.
Colstrip Power Plant
NAES Power Contractors has provided ongoing maintenance, modification and construction at the 2,218 MW Colstrip facility since 1988, including services during normal operating periods, scheduled outages and unscheduled outages. NPC provided the same services at the 154 MW Corette facility from 1988 until its closure in 2015.
AMP – Fremont Energy Center
AMP Fremont is a 540 MW nominal load 2 x 1 natural gas fired generating station with 163 MW of duct-firing capacity. American Municipal Power (AMP) and its members self-operate several electric plants. However, for its first combined-cycle gas turbine facility – the 703 MW Fremont Energy Center in northwestern
Elwood Energy
The largest simple cycle plant in the US, Elwood consists of 9 GE Frame 7FA combustion turbines. The facility is a full merchant power as of Spring 2017 with 15 full-time employees covering 24/7. Elwood, Illinois: NAES Environmental Services was responsible for successfully permitting the addition of Blackstart engines and low
Mid-Connecticut
Connecticut’s Materials Innovation and Recycling Authority (MIRA) facility presents a triple challenge to an operator, in that its three discrete units – a Waste Processing Facility (WPF), a Power Block Facility (PBF) and an auxiliary Jet Turbine Facility (JTF) – each require a separate operating plan. ‘NAES Safe’ Program Turns
Minnesota River Station
49 MW dual-fuel natural gas and oil plant that consists of an electric generation plant and a distribution substation located in Chaska, Minnesota. The facility sits on seven acres approximately 500 feet from the Minnesota River. Dry Air Injection System Solves Humidity-RelatedElectrical Problem at MMPA Minnesota River By Bob Burchfield –
Shady Point
NAES Environmental serviced a 320 MW coal-fired cogeneration plant in the mid-west, which utilizes four coal-fired circulation fluidized bed (CFB) boilers and two steam turbines and their respective generators. The facility controls NOx and SO2 emissions with CFB boiler technology. The addition of limestone into the boilers reduces the SO2 emissions while low